Brunvoll - Kongsberg - Kawasaki - Schottel - Jastram - Wartsila

Complete overhaul of bow thrusters and stern thrusters, including:

Preparation and Safety Measures

- Isolating the thruster from power and hydraulic sources
- Securing the work area and using appropriate lifting equipment

Disconnection of hydraulic systems

- Draining hydraulic fluids and disconnecting hoses and valves

Removal of the propellers and blades

- Loosening and extracting propeller bolts or nuts
- Carefully detaching propeller blades to prevent damage

Disassembly of the gearbox and drive system

- Dismantling the gearbox cover and extracting gears, shafts and bearings.
- Inspecting components for wear, cracks or misalignment.

Extraction of the shaft and bearings

- Removing the main shaft and associated bearings

Dismantling of the motor and couplings

- Detaching the electric or hydraulic motor
- Inspecting couplings and mounting brackets

Seal and o-ring replacement